ISO-Certificated Seamless Tube Splicing Studded Model Membrane Wall
Contact Supplier
Product Highlights
- ISO and CE Certification: Certified by ISO, CE, and ASME standards for quality and safety compliance.
- Customized Design: Material and dimensions can be customized as per specific design requirements.
- Comprehensive Quality Testing: Includes 100% X-ray inspection and hydraulic pressure testing for all welds.
- Long Service Life: Boilers can last over 20 years with proper operation and maintenance.
- Class A Production Qualification: Factory holds Class A boiler production qualification with extensive export experience.
- Full Customization Support: Supports customization for colors, logos, designs, packaging, and language brochures.
- Efficient Delivery: Standard delivery time is 30 days, with off-peak season delivery within 15 workdays.
- Advanced Manufacturing Process: Features hot/cold rolling, heat treatment, and precision welding assembly.
Product Attributes
- Customization
- Available
- Certification
- CE, ISO
- Customized
- Customized
- Model NO.
- Boiler Membrane Wall
- Surface Treatment
- Painted
- Fuel
- Coal
- Range of Applications
- Power station, Industrial
- Type
- Boilers Head
- Certificate
- CE, ISO, ASME
- Quality Warranty
- 2 Years
- X-ray Test
- 100%
- Hydraulic Test
- 100%
- Delivery Time
- 30days
- OEM
- Yes
- ODM
- Yes
- Material
- as Per Design Requirement
- Transport Package
- Sea Worthy Package
- Specification
- SZL35
- Trademark
- xingfu
- Origin
- China
- HS Code
- 8402900000
- Production Capacity
- 10000units Per Year
Product Images of ISO-Certificated Seamless Tube Splicing Studded Model Membrane Wall
Find Similar Products
Product Description
| Name | Membrane water panel / boiler membran wall |
| Material | Carbon steel,Alloy steel,etc. |
| Tube size | Φ38 - 76 mm, Customization |
| Standard | ISO , CE , ASME |
| Model | Studded, Flat welding |
| Dimension | Customization |
| Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging |
|
Installation location |
Around the boiler combustion chamber |
Related Prducts
Work Shop Display
Qingdao Xingfu Energy Equipment located at, Qingdao city, is founded in 2010, is a traditional and deeply accumulation& innovation high-tech enterprise in Shandong province. The company Specializes in researching, developing, designing, manufacturing, and selling industrial boilers, pressure vessels, waste tires & plastics pyrolysis system, biomass burners, biomass gasification, etc.
Xingfu Energy has strong R&D Strength. It has 78 technicians(21% of workers), 28 engineers(58% of technicians), 136skilled workers(59% of workers), 65qualified welders(47% of skilled workers). It covers an total area of 70500 square meters, including 21000 square meters plant area and 228 workers. From the year of 2012, our domestic sales revenue has broken through 100 million RMB. Now our company has passed the certificates of CE and ISO9001 quality management system, third measurement of units, and possessed B levels boiler maker, first& second pressure vessel licenses and installation boiler license by Qingdao Municipal Bureau of Labor.
Xingfu Energy products have been exported to more than 30 different countires, such as Mongolia, Indonesia, Korea, Malaysia, Polan, Spain, etc. All our products have gained highly reputation from our customers.


Q1: How quickly can you get the best price?
(1) We need to know the capacity of the boiler, the fuel you plan to use and your steam pressure needs, then we can confirm theboiler model.
(2) Customers need to provide us with your name, email address and company name, then we will send you the price list immediately.
Moreover, if you use whatsapp, skype or wechat, then you can provide us your ID, which will be more convenient for us to
communicate.
Q2: Why choose us?
(1)Class A boiler production qualification factory with many years export experience
(2)100% steel plate, steel pipe, welding rod without damage;
(3)100% x-ray inspection (welds): ensure the quality of the whole boiler;
(4) Water pressure test: to ensure standard working pressure and safety;
Q3: What is the service life of your boiler?
A: UsuallyWith proper operation and good maintenance, the boiler can last for more than 20 years
Q4: Can I have my own customized products?
A: Of course you can, your customized requirements for colors, logos, designs, packaging, carton marking, language brochures, etc.
can all be met.
Dear friends, you can contact us through my contact form or send us your inquiry directly. Click on "Send Inquiry" or "Chat Now"!
About the Supplier
Company Profile
Qingdao Xingfu Energy Equipment located at, Qingdao city, is founded in 2010, is a traditional and deeply accumulation& innovation high-tech enterprise in Shandong province. The company Specializes in researching, developing, designing, manufacturing, and selling industrial boilers, pressure vessels, waste tires & plastics pyrolysis system, biomass burners, biomass gasification, etc.
Xingfu Energy has strong R&D Strength. It has 78 technicians(21% of workers), 28 engineers(58% of technicians), 136skilled workers(59% of workers), 65qualified welders(47% of skilled workers). It covers an total area of 70500 square meters, including 21000 square meters plant area and 228 workers. From the year of 2012, our domestic sales revenue has broken through 100 million RMB. Now our company has passed the certificates of CE and ISO9001 quality management system, third measurement of units, and possessed B levels boiler maker, first& second pressure vessel licenses and installation boiler license by Qingdao Municipal Bureau of Labor.
Xingfu Energy products have been exported to more than 30 different countires, such as Mongolia, Indonesia, Korea, Malaysia, Polan, Spain, etc. All our products have gained highly reputation from our customers.
About Our Factory & Business Background
- Address
- No. 3009, Tower 3, Zhuoyue Century Center, No. 31th Longcheng Road, Qingdao, Shandong, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Small-amount payment, Money Gram
- International Commercial Terms(Incoterms)
- FOB, EXW, CFR, CIF, DAT, FAS, DAP, FCA
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays - Nearest Port
- Qingdao, Tianjin, Lianyungang
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2020-07-13
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- Why choose us?
- Class A boiler production qualification factory with many years export experience. 100% steel plate, steel pipe, welding rod without damage. 100% x-ray inspection (welds): ensure the quality of the whole boiler. Water pressure test: to ensure standard working pressure and safety.
- What is the service life of your boiler?
- UsuallyWith proper operation and good maintenance, the boiler can last for more than 20 years
- Can I have my own customized products?
- Of course you can, your customized requirements for colors, logos, designs, packaging, carton marking, language brochures, etc. can all be met. Dear friends, you can contact us through my contact form or send us your inquiry directly. Click on 'Send Inquiry' or 'Chat Now'!
Send your message to this supplier
People who viewed this also viewed
-
US$3,750.00-11,750.00 / Set
-
US$3,750.00-11,750.00 / Set
-
US$3,700.00-370,000.00 / Set
-
US$2,600.00 / Ton
Product Categories
Find Similar Products By Category
- Supplier Homepage
- Products
- Boiler Parts
- ISO-Certificated Seamless Tube Splicing Studded Model Membrane Wall
Related Categories
Hot Searches
- Water Temperature
- Water Tube Factories
- Welding Tube Factories
- Wall Fan Factories
- Membrane Equipment
- Membrane Water
- Membrane Machinery
- Membrane Pressure
- Liquid Membrane
- Studded Model Membrane Wall Bulkbuy